All tracks are in with the exception of the south end of the Grain Elevator ( waiting on magnets)
1)Ballesting is about 50% complete
2) 1/2 of the ground throws are in.
3) most of the buildings are in
4) John started dropping feeder wires for the DCC
5) Connection to the north end of North Trager is complete including 2' dead spots on all three yard tracks to prevent DCC engine entering DC territory and vice versa.
6) The two loops have been Ballasted as well as The long lead to the southwest corner steelmill area ( just on the "Desoto" wall.
7) The first layer of ballest has been applied to the double crossover area.

we are ALMOST ready to fit the "removable piece back into position and decide of "easy Scenery for that area.
9) The hole in the wall is cut and ready to install staging tracks over the workbench.
If anyone wants to help, I will be off all next week and plan of trying to finish as much as possible. Wed I have to get bloodwork done but should be at the club 80% of the time.
Come on out and hel us get past this final phase of the largest expansion the club has done in at least 20 years
We still have plenty of kits to build for the NEW Turner City. Come look through the boxes and see what you want to work on.